Standardization of Manufacturing Technology
Over 3000 product introductions and process improvements

Standardization of Manufacturing Technology

Quality System


We have successively passed QS9000, ISO9001:2000, ISO14001:2004 and UL certifications, and implemented a 3TTQC system internally (technical system, training system, quality system, customer system) to enable the company to have fast manufacturing capabilities, provide qualified and reliable products, deliver on time, competitive prices and complete customer service, and truly meet customer needs.


Prenatal evaluation

The introduction of new products is organized by the engineering department, with personnel from the production department, procurement department, and quality department holding a new product introduction meeting to ensure that the project is delivered with quality and quantity guaranteed.


BOM review

Check the customer supplied PCB files, drawings, and coordinates, verify the BOM list, optimize material descriptions, verify models, packaging, quantities, and part numbers, and improve brand specifications and part number information.


Process review

Develop new material/process/design operation requirements, review and confirm data documents, ensure that material and PCB specifications meet the requirements for machine operation, and meet the requirements for material baking conditions.


Material inspection

Implement new material sample management to ensure that the quality of material samples meets product requirements and serves as the basis for procurement, ordering, and incoming inspection.


Incoming Inspection

Inspect raw materials to ensure product quality, measure resistance and capacitance values based on BOM list, screen print A-class materials, check the compatibility between components and PADs, inspect pins for deformation and oxidation, and PCB appearance.


Tool validation

Newly opened steel mesh, testing fixtures, wave soldering fixtures, and plate splitting fixtures shall be provided with drawing specifications by the engineering department, and the process material requirements shall be indicated.


Furnace temperature monitoring

9-channel furnace temperature testing instrument combined with PCBA physical board to test actual welding temperature, 260C<10S, 235 degrees Celsius 60-90 seconds.    


First Article Inspection

By integrating BOM tables, coordinates, and high-definition scanned first article images, an automatic detection program is generated to quickly and accurately detect components, automatically determine results, generate first article reports, and enhance quality control.


Process detection

Fully automated process inspection first piece inspection instrument, SPI solder paste inspection instrument, 100% AOI inspection, BGA device Ray inspection.